1. According to the letter NO. (113) M0306-1 by HMM pacific Co., Ltd. Taiwan Branch on March 6th, 2024.
2. Work period: From 8:00 am March 13th to 6:00 pm on April 13th, 2024.
3. During the work period, the boom will be extended about 60 meters horizontally over the water, with a height of approximately 40 meters above the dock surface. The lighting warning system will be activated at night. Ships near the terminal should pay special attention to the boom for navigation safety.
4. Contact person and phone number :
(a) 07-8313999#5342, 0926115797.
(b) 07-8313999#5242, 0955023304.
(c) 07-8235225.