1. According to the letter NO.5 by HMM pacific Co., Ltd. Taiwan Branch on February 7th, 2024.
2. Work period: From 8:00 am on February 15th to 6:00 pm on February 29th, 2024.
3. During the work period, the boom will be extended about 55 meters horizontally over the water, with a height of approximately 45 meters above the dock surface. The lighting warning system will be activated at night. Ships near the terminal should pay special attention to the boom for navigation safety.
4. Contact person and phone number :
(1)(07)572-8125、0920-110694.
(2) (07)571-8644#279、0935-483403.