1. According to the fax by HMM pacific Co., Ltd. Taiwan Branch on January 15th, 2024.
2. Work period: From 9:00 am to 5:00 pm on January 15th, 2024.
3. During the work period, the boom will be extended about 60 meters horizontally over the water, with a height of approximately 38 meters above the dock surface. The lighting warning system will be activated at night. Ships near the terminal should pay special attention to the boom for navigation safety.
4. Contact person and phone number : (07)572-8125、0920-110694.