- According to the letter No. 1136210599 by our branch on JMay 30th, 2024.
- Work period: From June 1st to August 22th 2024.
- Vessels Involved in the Operations:
- (1) Tugboats: Dongyan No. 1, Rongbang No. 5, Haiyang No. 9, Haichan No. 8, Donglian No. 8, Yimin No. 8.
- (2) Work Platform Ships: Dongping No. 5, Dongping No. 6, Rongbang No. 7, Yimin No. 2, Hongyuan No. 2.
- (3) Cranes: Dongping No. 9, Dongping No. 8.
- (4) Self-Elevating Platform Ships: Dongyan No. 113, Dongyan No. 115, Dongdi No. 1.
- (5) Dredging Ship: Dongyan No. 2.
- (6) Floating Sinking Platforms: Junlie No. 1.
- (7) Survey Ship: Rescue No. 1.
- Contact Persons and Phone Numbers:
- (1) Construction Company: Dongpi Construction Co., Ltd., Wu Jiazhang 07-8067088.
- (2) Supervising Companies: CECI Engineering Consultants, Inc., Taiwan, He Shengying 07-3309996; Yu Tai Engineering Consultants, Ltd., Huang Zixiu 07-8216909.
- (3) Our Company: Engineer Liao Wencheng 07-5622674.
- A copy of the "Operation Location Map" is attached for your reference.
Attachment download
File Name | File format |
---|---|
Operation Location Map Hash Value |
![]()
File format:PDF
File Size:775 KB
Download Counter:0
|