Explanation:
1. According to the fax by HMM pacific Co., Ltd. Taiwan Branch on September 30th, 2024.
2.Work period: From 04:00 pm on September 30th to 06:00 pm on October 3rd, 2024.
3.During the work period, the boom will be extended about 64 meters horizontally over the water, with a height of approximately 43 meters above the dock surface. The lighting warning system will be activated at night. Ships near the terminal should pay special attention to the boom for navigation safety.
4. Contact person and phone number : 07-5728125, 0920110694.