1. This operation is conducted according to the fax from Evergreen Marine Corp. (Taiwan) Ltd on August 18, 2025.
2. Work period: From 8:30 AM to 8:00 PM on August 19, 2025.
3. During the work period, the boom will be lowered to a horizontal position, extending approximately 63 meters over the water. Warning lights will be activated at night. Vessels near the terminal should pay special attention to the boom to ensure navigational safety.
4. Contact person and phone number: (07)571-5171#7312.