Explanation:
1. This matter is handled in accordance with our branch’s official letter No. 1146552035 dated October 13, 2025.
2. Work period: From October 17, 2025, to January 15, 2026.
3. Working vessels: Wan Da No. 2* drilling platform and Wan Da No. 9 workboat.
4. Contact persons and phone numbers:
(1) Contractor: Wan Da Geotechnical Consultants Co., Ltd. (Tel: 02-2657-8333); on-site contact: Mr. Chang Kuan-Yu (Mobile: 0960-634-689).
(2) Our branch: Engineer Lee Chung-Tao (Tel: 07-562-2524).
5. A copy of the “Operational Plan Description” is attached for your reference.
Attachment download
| File Name | File format |
|---|---|
| Operational Plan Description Hash Value |
File format:PDF
File Size:405 KB
Download Counter:1
|