Move to Main Content
::: MenuButtonText

Notice Regarding Offshore Drilling Operations for the “Design and Construction Supervision of the Breakwater Works” and the “Design of Wharf and Connecting (Bridge) Road Works” under the “Kaohsiung Port Intercontinental LNG Terminal Construction Project” Organized by Our Branch Office. Please inform your affiliated members or advise vessels navigating the area to exercise caution and avoid the designated waters to ensure navigational safety.

:::
2025-11-05 Kaohsiung
Harbor No. 1146592837
Explanation:
1. This matter is handled in accordance with our branch’s official letter No. 1146552035 dated October 13, 2025.
2. Work period: From October 17, 2025, to January 15, 2026.
3. Working vessels: Wan Da No. 2* drilling platform and Wan Da No. 9 workboat.
4. Contact persons and phone numbers:
(1) Contractor: Wan Da Geotechnical Consultants Co., Ltd. (Tel: 02-2657-8333); on-site contact: Mr. Chang Kuan-Yu (Mobile: 0960-634-689).
(2) Our branch: Engineer Lee Chung-Tao (Tel: 07-562-2524).
5. A copy of the “Operational Plan Description” is attached for your reference.
Attachment download
File Name File format
Operational Plan Description Hash Value File format:PDF
File format:PDF File Size:405 KB Download Counter:1
Last Updated:2025-11-05
Top