Explanation:
1. This matter is handled in accordance with our branch office’s letter No. 1146223521 dated December 2, 2025.
2. Work period: From June 1, 2024, to December 15, 2026.
3. Construction vessels: A total of 46 vessels, including Dong Yan No. 1, among others.
4. Contact persons and phone numbers are as follows:
(1) Contractor:** Tung Pi Construction Co., Ltd. (Contact: Mr. Wu Chia-Chan, Tel: 07-8067088).
(2) Supervision consultants:
• CECI Engineering Consultants, Inc., Taiwan (Contact: Mr. Ho Sheng-Ying, Tel: 07-3309996).
• Yu Tai Engineering Consultants Co., Ltd. (Contact: Mr. Huang Tzu-Hsiu, Tel: 07-8216909).
(3) Our branch office: Engineer Chou Ting-Ying – Tel: 07-5622668.
5. Copies of the “Construction Area Map” and “Contact Personnel List” are attached for your reference.
Attachment download
| File Name | File format |
|---|---|
| Construction Area Map Hash Value |
File format:PDF
File Size:597 KB
Download Counter:0
|
| Contact Personnel List Hash Value |
File format:PDF
File Size:1 MB
Download Counter:0
|