Harbor No. 1146590488
Explanation:
1. This operation is conducted according to the fax from KMCT on February 12, 2025.
2. Work period:
(1) Gantry Crane GC-1211 at Pier 121: March 11 to March 12, 2025 (all-day operation).
(2) Gantry Crane GC-1202 at Pier 120: March 13 to March 14, 2025 (all-day operation).
3. During the work period, the boom will be lowered to a horizontal position, extending horizontally 64 meters and approximately 43 meters over the water. Warning lights will be activated at night. Vessels near the terminal should pay special attention to the boom to ensure navigational safety.
4. Contact person and phone number: 0958-388-339, 07-5622917.