Explanation:
1. According to our branch's letter No. 1146216133 dated August 19, 2025.
2. Operation Period: From August 19, 2025, to January 15, 2026.
3. Working Vessels: Wanda No. 1 Drilling Platform, Fu De No. 1 Tugboat.
4. Contact persons and phone numbers are as follows:
(1) Offshore Drilling Contractor: Wanda Soil Technology Consultants Co., Ltd. (Tel: 02-26578333); On-site contact: Mr. Chang Kuan-Yu (Mobile: 0960-634-689).
(2) Our company: Engineer Lee Chung-Tao, Tel: 07-5622524.
5. A copy of the " Construction Location Map" is attached for your reference.
Attachment download
File Name | File format |
---|---|
Construction Location Map Hash Value |
![]()
File format:PDF
File Size:2 MB
Download Counter:1
|