Move to Main Content
::: MenuButtonText

Regarding the Extension of the Offshore Drilling Operations Period for the Technical Services Commissioned under the “Kaohsiung Port Intercontinental Liquefied Natural Gas (LNG) Receiving Terminal Con

:::
Harbor No. 1156590044
Explanation:
1. This matter is handled in accordance with our branch office’s letter No. 1146552646, Kaogang Gong Zi, dated December 30, 2025.
2. Operation period: From October 17, 2025, to March 31, 2026.
3. Operating vessels: Wanda No. 1 Drilling Platform, Wanda No. 2 Drilling Platform, Fude No. 1 Tugboat, and Wanda No. 9 Workboat.
4. Contact persons and phone numbers:
   (1) Executing contractor: Wanda Soil Technology Consultants Co., Ltd. (Tel: 02-26578333); on-site contact: Mr. Chang Guan-Yu (Mobile: 0960-634-689).
   (2) Our branch office: Engineer Li Chong-Dao, Tel: 07-5622524.
5. One copy of the “Operation Plan Description” is enclosed for reference.
Last Updated:2026-01-07
Top