1. This operation is conducted in accordance with Wan Hai Lines Ltd.’s fax notice dated May 8, 2026.
2. Operation Period: From 8:00 a.m. to 6:00 p.m., May 8, 2026.
3. During the operation, the crane boom will be lowered to a horizontal position, extending approximately 55 meters over the water with a vertical clearance of 40 meters above the wharf surface. A lighting system will be activated during nighttime hours. Vessels in the vicinity of the wharf are advised to exercise special caution regarding the extended boom to ensure navigational safety.
4. Contact Person and Phone Number:
Maintenance Section, Mr. Zhan Jun-Jie, Tel: (07) 8123342 ext. 803.