- This matter is handled in accordance with the Letter No. 1156211480 issued by this Regional Office on June 23, 2026.
- A brief overview of the project is as follows:
- Project Period: From now until September 23, 2030 .
- Newly Added Vessel: "Dong Ping No. 19".
- Contacts and Telephone Numbers:
- Construction Contractor: Dong Pi Construction Co., Ltd.
- Site Manager: Liu Chang-yan (Mobile: 0935-876710).
- Site Manager: Wu Zhi-hui (Mobile: 0937-782858).
- Supervising Consultant: CECI Engineering Consultants, Inc., Taiwan
- Supervision Manager: Wang Shi-ming (Mobile: 0972-282457).
- Regional Office Contact: Chen Zhu-jun (Tel: 07-5622755).
- Construction Contractor: Dong Pi Construction Co., Ltd.
- The coordinate map of control points for the Notice to Mariners is attached herewith. Please forward this information to your members or vessels. When navigating through the specified waters, please maintain caution and avoid the area to ensure the safety of both operations and navigation.
Attachment download
| File Name | File format |
|---|---|
| Proposed Mobilization of Additional Fleet/Vessels for Harbor Operations in the "Kaohsiung Port Intercontinental LNG Terminal Construction Project" — For your review and action. Hash Value |
File format:PDF
File Size:643 KB
Download Counter:0
|