Regarding the Case of lowering the Boom of Quay Crane GC-08 by Wan Hai Lines Ltd. at Wharves No. 63 and 64 of Kaohsiung Port, Details are as Described in the Explanation, Please Be Informed Accordingl

:::

Regarding the Case of lowering the Boom of Quay Crane GC-08 by Wan Hai Lines Ltd. at Wharves No. 63 and 64 of Kaohsiung Port, Details are as Described in the Explanation, Please Be Informed Accordingly.

  1. Reference: Handled in accordance with the fax from Wan Hai Lines Ltd. dated July 8, 2026.
  2. Operation Schedule: From 08:00 to 24:00 on July 8, 2026.
  3. Operation Location: Wharves No. 63 and 64.
  4. Operation Details: During the operation, the boom of the quay crane will be lowered and extended approximately 55 meters over the water, at a height of about 40 meters above the wharf surface.
  5. Contact Person: Mr. Chun-Chieh Zhan, Maintenance Section, Wan Hai Lines Kaohsiung Terminal. Tel: (07) 812-3342 ext. 803.
  6. Action Required: Please notify your members or vessels to navigate with caution and maintain a safe distance when passing through this area, ensuring both operational and navigational safety.
Last Updated:2026-07-08