- Reference: Handled in accordance with the fax from Wan Hai Lines Ltd. dated July 9, 2026.
- Operation Period: From 1200 hours on July 10, 2026, to 1200 hours on July 13, 2026..
- Operation Location: Wharves No. 63 and 64.
- Operation Details: During the operation, the boom of the quay crane will be lowered and extended approximately 55 meters over the water, at a height of about 40 meters above the wharf surface.
- Contact Person: Mr. Chun-Chieh Zhan, Maintenance Section, Wan Hai Lines Kaohsiung Terminal. Tel: (07) 812-3342 ext. 803.
- Action Required: Please notify your members or vessels to navigate with caution and maintain a safe distance when passing through this area, ensuring both operational and navigational safety.
:::