Explanation:
1. This operation is conducted in accordance with Wan Hai Lines Ltd.’s fax notice dated August 11, 2026.
2. Operation Period: From 8:00 a.m., August 11, 2026 to 11:59 p.m., August 31, 2026.
3. During the operation, the crane booms will be lowered to a horizontal position, extending approximately 69.7 meters over the water with a vertical clearance of 55 meters above the wharf surface. A lighting system will be activated during nighttime hours. Vessels in the vicinity of the wharf are advised to exercise special caution regarding the extended booms to ensure navigational safety.
4. Contact Person and Phone Number: Operations Section, Mr. Liao Ting-Yu, Tel: (07) 812-3342 ext. 555.