Explanation:
1. This operation is conducted in accordance with our branch office’s official letters No. 1156215726 dated August 25, 2026, and No. 1156215727 dated August 26, 2026.
2. Operation Period:
(1) Geological Drilling Operations: From August 25, 2026 to December 5, 2026.
(2) Bathymetric and Topographic Surveys: From August 20, 2026 to October 10, 2026.
3. Survey Vessel for Bathymetric and Topographic Surveys: Quan Hua 168.
4. Contact Persons and Phone Numbers:
(1) Geological Drilling Operations: Sheng Chuan Engineering Co., Ltd. (Tel: 07-7515577), Mr. Huang Cheng-Lü (Cell: 0937-678233).
(2) Bathymetric and Topographic Surveys: Hua Guo Surveying & Mapping Co., Ltd. (Tel: 02-26439699), Mr. Zhang Ren-Jun (Cell: 0972-797377).
(3) Port Authority Contact: Engineer Zhang Kai-Xiang, Tel: 07-5622481.
5. Attached herewith is one copy of the "Operational Area Map."
Attachment download
| File Name | File format |
|---|---|
| Notice Regarding Geological Drilling Operations, Bathymetric and Topographic Surveys for the Design and Construction Supervision Technical Services of the "Wharves No. 61 and 62 Reconstruction Project Hash Value |
File format:PDF
File Size:545 KB
Download Counter:0
|