Move to Main Content
::: MenuButtonText

Notice Regarding Geological Drilling Operations, Bathymetric and Topographic Surveys for the Design and Construction Supervision Technical Services of the "Wharves No. 61 and 62 Reconstruction Project

:::
Ref No: Harbor No. 1156592418
Explanation:
1. This operation is conducted in accordance with our branch office’s official letters No. 1156215726 dated August 25, 2026, and No. 1156215727 dated August 26, 2026.
2. Operation Period:
(1) Geological Drilling Operations: From August 25, 2026 to December 5, 2026.
(2) Bathymetric and Topographic Surveys: From August 20, 2026 to October 10, 2026.
3. Survey Vessel for Bathymetric and Topographic Surveys: Quan Hua 168.
4. Contact Persons and Phone Numbers:
(1) Geological Drilling Operations: Sheng Chuan Engineering Co., Ltd. (Tel: 07-7515577), Mr. Huang Cheng-Lü (Cell: 0937-678233).
(2) Bathymetric and Topographic Surveys: Hua Guo Surveying & Mapping Co., Ltd. (Tel: 02-26439699), Mr. Zhang Ren-Jun (Cell: 0972-797377).
(3) Port Authority Contact: Engineer Zhang Kai-Xiang, Tel: 07-5622481.
5. Attached herewith is one copy of the "Operational Area Map."
 
Attachment download
File Name File format
Notice Regarding Geological Drilling Operations, Bathymetric and Topographic Surveys for the Design and Construction Supervision Technical Services of the "Wharves No. 61 and 62 Reconstruction Project Hash Value File format:PDF
File format:PDF File Size:545 KB Download Counter:0
Last Updated:2026-08-27
Top