Explanation:
1. This operation is conducted in accordance with our branch office’s official letter No. 1156215836, dated August 26, 2026.
2. Operation Period: From September 1, 2026 to September 30, 2026.
3. Working Vessels: Feng Cheng No. 6, Feng Cheng No. 8.
4. Contact Persons and Phone Numbers:
(1) Contractor: Yi Shan Construction Co., Ltd. (Tel: 07-8214813), Site Director Mr. Xie Guo-Ping (Cell: 0931-326975).
(2) Supervision Consultant: Unitech Engineering Consultants, Inc., Mr. Li Ji-Yu (Cell: 0933-054625).
(3) Port Authority Contact: Engineer Su Xiu-Hong, Tel: 07-5622669.
5. Attached herewith is one copy of the "Construction Area Map."
Attachment download
| File Name | File format |
|---|---|
| Notice Regarding Dredging, Reclamation, and Bathymetric Survey Construction Operations for Part 2 of the "Wharves Reconstruction Project at Container Terminals No. 3 and No. 5 in Kaohsiung Port" Condu Hash Value |
File format:PDF
File Size:803 KB
Download Counter:1
|