Move to Main Content
::: MenuButtonText

Notice Regarding Construction Operations, Including Part 1 Works and Dredging Operations at Wharf No. 78 for the "Kaohsiung Port Container Terminals No. 3 and No. 5 Wharf Reconstruction Project," Cond

:::
Ref No: Harbor No. 1156593137
Explanation:
1. This operation is conducted in accordance with our branch office’s official letter No. 1156220729, dated November 6, 2026.
2. Operation Period: From November 9, 2026 to December 31, 2026.
3. Working Vessel: ASL1870.
4. Contact Persons and Phone Numbers:
(1) Contractor: Yi Shan Construction Co., Ltd. (Site Office Tel: 07-8214813; Site Superintendent: Mr. Liu Lian-Fu, Cell: 0929-422-050).
(2) Supervision Consultant: CECI Engineering Consultants, Inc., Taiwan (Supervision Director: Mr. Hsu Shih-Tsung, Cell: 0933-388-803).
(3) Port Authority Contact: Engineer Su Hsiu-Hung, Tel: 07-5622669.
5. Attached herewith is one copy of the "Operational Location Map."
 
Attachment download
File Name File format
Notice Regarding Construction Operations, Including Part 1 Works and Dredging Operations at Wharf No. 78 for the "Kaohsiung Port Container Terminals No. 3 and No. 5 Wharf Reconstruction Project," Cond Hash Value File format:PDF
File format:PDF File Size:575 KB Download Counter:0
Last Updated:2026-11-12
Top