Explanation:
1. This operation is conducted in accordance with our branch office’s official letter No. 1156220529, dated November 10, 2026.
2. Operation Period: From June 1, 2024 to March 31, 2027.
3. Working Vessels:
(1) Tugboats: Dong Yan No. 1, Rong Bang No. 5, Hai Yang No. 9, Hai Qian No. 8, Dong Lian No. 8, Yi Min No. 8, Dong Ping No. 1, Dong Ping No. 2, Dong Yan No. 3, Rong Bang No. 3, He Zhou, Yi Lin No. 3, Yi Lin No. 6, Feng Wen No. 1, Hang Wen No. 1, Hang Wen No. 5.
(2) Work Barges: Dong Ping No. 5, Dong Ping No. 6, Rong Bang No. 7, Yi Min No. 2, Hong Yuan No. 2, Dong Ping No. 15, Chang Rui No. 2, He Long No. 106, He Long No. 107, Dong Long No. 8, He Long No. 101, Hong Yuan, Hang Wen No. 2, Dong Ping No. 18.
(3) Crane Barges: Dong Ping No. 9, Dong Ping No. 8.
(4) Self-Elevating Platform Vessels (Jack-up Barges): Dong Yan No. 113, Dong Yan No. 115, Dong Di No. 1, Dong Yan No. 112.
(5) Dredger: Dong Yan No. 2.
(6) Submersible Barge: Jun Yi No. 1.
(7) Survey Vessel: Jiu Nan No. 1.
(8) Hopper Barges: Dong Ping No. 12, Dong Ping No. 13, Feng Fu No. 3, Feng Fu No. 12.
(9) Piling Barge: Guo Huang No. 9.
(10) Sand Pumping Dredgers: Kun De, Kun De No. 2, Kun De No. 12 (Newly added in this notice).
4. Contact Persons and Phone Numbers:
(1) Contractor: Dong Pi Construction Co., Ltd. (Mr. Wu Chia-Chan, Tel: 07-8067088).
(2) Supervision Consultants: CECI Engineering Consultants, Inc., Taiwan (Mr. Ho Sheng-Ying, Tel: 07-3309996); SinoTech Engineering Consultants, Ltd. / Yu Tai Engineering Consultants Co., Ltd. (Mr. Huang Tzu-Hsiu, Tel: 07-8216909).
(3) Port Authority Contact: Engineer Chou Ting-Ying, Tel: 07-5622668.
5. Attached herewith is one copy of the "Construction Area Map."
Attachment download
| File Name | File format |
|---|---|
| Notice Regarding the Addition of Maritime Construction Vessels and Machinery for the "Kaohsiung Port Canal No. 4 Wharf and Revetment Reconstruction Project" Conducted by Our Branch Office. As detailed Hash Value |
File format:PDF
File Size:608 KB
Download Counter:0
|