1. Explanation:
2. This operation is conducted in accordance with our branch office’s official letter No. 1156221862, dated November 24, 2026.
3. Operation Period: From November 20, 2026 to June 5, 2027.
4. Working Vessel: Fu De No. 1.
5. Contact Persons and Phone Numbers:
(1) Yu Tai Engineering Consultants Co., Ltd.: Mr. Li Yen-Hua, Cell: 0958-022-613.
(2) Sheng Chuan Engineering Co., Ltd.: Mr. Huang Cheng-Lu, Cell: 0937-678-233.
(3) Port Authority Contact: Engineer Chen Ya-Wen, Tel: 07-5622806.
6. Attached herewith is one copy of the "Operational Location Map."
Attachment download
| File Name | File format |
|---|---|
| Notice Regarding Offshore Drilling Operations for the "Design and Supervision Technical Consulting Services for the Kaohsiung Port Land Reclamation Area Seawall Construction Project" Conducted by Our Hash Value |
File format:PDF
File Size:450 KB
Download Counter:0
|